Installation Preparations; Tools - Huawei FusionCol8000-C210 User Manual

In-room chilled water smart cooling product
Hide thumbs Also See for FusionCol8000-C210:
Table of Contents

Advertisement

FusionCol8000-C210 In-room Chilled Water Smart
Cooling Product
User Manual (2022, Netherland GS)
(1) Balance valve or isolation
valve
(4) Flexible connection
(7) External components

4.2 Installation Preparations

4.2.1 Tools

The onsite technical personnel can select tools based on the site requirements.
Personal Protective Equipment
Safety helmet
Reflective vest
Safety harness
Issue 01 (2022-12-30)
NO TE
● The component shown by (6) in the preceding figure is delivered with the smart cooling
product. Other components need to be purchased and installed onsite. Do not install the
other components directly under the cabinet.
● The isolation valve of the branch chilled water inlet (C) is normally closed and is opened
when the filter of the main chilled water inlet is maintained.
● It is recommended that a water strainer with 20 meshes and a pressure resistance of
greater than 1.6 MPa be used onsite. The actual pressure resistance depends on the site
requirements. The water strainer should be installed on the external water inlet pipe
and close to the smart cooling product.
Goggles
ESD gloves
Safety belt
Copyright © Huawei Digital Power Technologies Co., Ltd.
(2) Water strainer
(5) Chilled water valve
(external)
Dust mask
Insulated gloves
-
4 System Installation
(3) Isolation valve
(6) Heat exchanger
Protective shoes
Protective gloves
-
33