Huawei UPS5000-E-12 User Manual page 64

Table of Contents

Advertisement

UPS5000-E-(40 kVA-320 kVA)
User Manual
For details, see the battery installation guide delivered along with the batteries.
Step 2 (Optional) Install a BCB box.
For details, see the PDC-(0250, 0400, 0630) DC0384BXA BCB Box User Manual or
PDU8000-(0125, 0250, 0400, 0630, 0800) DCV8-BXA001 BCB Box User Manual delivered
with the BCB box.
Step 3 (Optional) Install a BBB box.
For details, see the PDU8000-(0630,1250,2000) DCV8-BGA001 BBB Box User Manual.
Step 4 (Optional) Install a BMU.
For details, see the UPS Battery Monitor Unit User Manual.
Step 5 (Optional) Install a battery grounding failure detector.
Install a battery grounding failure detector, as shown in
UPS5000-E-120K-F120/UPS5000-E-200K-F200),
UPS5000-E-320K-F320), and
Figure 3-19 Position for installing a battery grounding failure detector
(UPS5000-E-200K-F200/UPS5000-E-120K-F120)
(1) Battery grounding failure detector
Issue 10 (2015-09-15)
Figure 3-21
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Figure 3-19
Figure 3-20
(for the
(for the UPS5000-E-320K-F320T).
3 Installation
(for the
55

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-e-20Ups5000-e-3200k-f1200k-f200K-f320K-f320t

Table of Contents