Before using a top entry cabinet for cable routing, determine whether to place the top entry
cabinet on the left or right of the UPS5000-E cabinet. The scenario in which the top entry
cabinet is placed on the right of the UPS cabinet is used an example (the procedure is the
same if the top entry cabinet is placed on the left).
After routing cables, use fireproof mud to fill in the gap between the cables and the
cabinet.
Step 1 Place the top entry cabinet on the left or right of the UPS based on actual requirements.
Step 2 Remove the right panel from the UPS and the front panel from the top entry cabinet, and put
the panel and screws away.
Step 3 Level the feet of the top entry cabinet to make it in the same plane with the UPS.
Step 4 Remove the top entry panel for the top entry cabinet and the cover for control cables, and
reinstall the top cover on the top entry cabinet.
If you choose to route cables by drilling holes, paste grommet strip to the hole edge to protect cables.
Step 5 Install the connecting kit on the UPS. Combine the UPS and the top entry cabinet by using a
connecting kit, as shown in
Figure 3-27 Combining the UPS and the top entry cabinet
Step 6 Connect the UPS to the top entry cabinet with short-circuit busbars, as shown in
Issue 10 (2015-09-15)
Figure
3-27.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
Figure
3-28.
62

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ups5000-e-20Ups5000-e-3200k-f1200k-f200K-f320K-f320t

Table of Contents