UPS5000-E-(40 kVA-320 kVA)
User Manual
Step 4 (Optional) Connect cables to the input PDC.
For details, see the PDC-0630ACV4INA Power Distribution Unit User Manual.
Step 5 Select a parallel connection method to connect cables to the parallel system based on the site
configurations.
Figure 3-61
1+1 parallel system.
Figure 3-61 Conceptual diagram of a 1+1 parallel system
Issue 10 (2015-09-15)
and
Figure 3-62
show the typical conceptual diagram and cable connections for a
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
3 Installation
89