Please read the following Sections before proceeding with the installation:
• General warnings, in Section 5.1 on page 5-1
• Installation overview, in Section 5.2 on page 5-7
7.1

INCOMING INSPECTION AND VERIFICATION

It is strongly recommended to verify the operation of the Hydran 201Ti's and
Hydran 201Ci Controllers before their installation. This verification also confirms that no
damage occurred during shipping and allows the user to become familiar with the
Hydran 201i System. The Hydran 201Ci-C installation procedure is described in
Section 7.3 on page 7-6.
7.1.1

Receiving and Unpacking

Upon receipt, the shipping box contains one pre-assembled Hydran 201Ci-C.
1.
Open the shipping box.
2.
Remove the Test Certificate and Data Sheet (for an example, see Figure 6-1 on
page 6-4).
3.
Carefully remove the H201Ci-C from the box.
Note: Keep the packing material for storage or further shipment of the H201Ci-C.
7.1.2

Inspecting

Verify the Hydran 201Ci-C completely as outlined below.
1.
Inspect the enclosure for any visual damage (bump, scratch or others).
2.
Open the enclosure door using a flat-blade screwdriver.
Part 17997

Hydran 201Ci-C Installation

Rev. 6, March 2011
Chapter 7
7-1