Logging The Values Of The Service Data; Verifying And Setting The Date And Time; 6.4.10 Verifying And Setting The Communication Parameters - GE Hydran 201 i Instruction Manual

Hide thumbs Also See for Hydran 201 i:
Table of Contents

Advertisement

Chapter 6 • Hydran 201Ti Installation
6.4.8

Logging the Values of the Service Data

1.
Access the submenu H201Ti V2.2x;Service.
2.
Access the submenu Service;ServiceData.
3.
Write down the value of each parameter.
6.4.9

Verifying and Setting the Date and Time

For details on the parameters and commands in the submenu Date&Time, see
Section 4.5.5 on page 4-21.
1.
Access the submenu H201Ti V2.2x;Date&Time.
2.
If required, set the parameters Year, Month, Day, Hour and Minutes to local values.

6.4.10 Verifying and Setting the Communication Parameters

For details on the parameters and commands in the submenu Communication, see
Section 4.5.6 on page 4-21.
1.
Access the submenu H201Ti V2.2x;Communication.
2.
Verify and set, as required, the six communication parameters (which can only be
accessed from the Hydran 201Ti's keypad). Note the following considerations:
• Gas Monitor ID (identification number of the H201Ti): At least one H201Ti in the local
network must be set to an identification number from 1 to 5 inclusively. Each H201Ti in
the local network must have an exclusive number from 1 to 254.
• PowerStat. ID (identification number of the power station): All H201Ti's in the local
network (power station) must be set to the same PowerStat. ID value. This number can
vary from 1 to 9999.
3.
To continue the installation using a host computer, run the Hydran Host software to
define a local network using these identification numbers. See the Hydran Host
Software Manual.
6-34
Rev. 6, March 2011
Part 17997