2288H V5 Server
User Guide
4.
Step 5 Remove the front end of the holding rail.
1.
Issue 04 (2018-09-04)
Figure 3-6 Removing the server from the holding rails
Place the removed server on an ESD platform.
Hold down the plate on the front end of the holding rail and pull out the hook. See (1)
and (2) in
Figure
3-7.
Copyright © Huawei Technologies Co., Ltd.
3 Basic Operations
48