Tpm/Tcm - Huawei 2288H V5 User Manual

Table of Contents

Advertisement

2288H V5 Server
User Guide
Figure 5-54 Installing a DIMM
Step 10 Install the air duct or the built-in drive assembly. For details, see
or
3.11 Installing the Built-in Drive
Step 11 Install the chassis cover. For details, see
Step 12 Install the server. For details, see
Step 13 Connect the power cables. For details, see
Step 14 Power on the server. For details, see
Step 15 Use the Toolkit to perform a stress test on the new DIMM. For details, see the
Tools 2.0 Toolkit User
Step 16 Log in to the iBMC WebUI, and check whether the new component is normal. For details, see
the
----End

5.14 TPM/TCM

The server supports Trusted Platform Module (TPM) 2.0 and Trusted Cryptography Module
(TCM).
Note that:
l
l
Issue 04 (2018-09-04)
Guide.
Huawei Rack Server iBMC User
If the key function of the TPM/TCM is used to encrypt data, back up the data before
removing the TPM/TCM. If no backup is available, the encrypted data cannot be
decrypted after the TPM/TCM is replaced.
Before removing the TPM/TCM, check whether some TPM/TCM functions have been
set on the BIOS. If yes, you need to set these functions again after replacing the TPM/
TCM. For details, see the
Reference.
Copyright © Huawei Technologies Co., Ltd.
Assembly.
3.5 Installing the Chassis
4.4 Installing the Server on Guide
5.4
PSU.
3.1 Powering On the
Guide.
Huawei Server Purley Platform BIOS Parameter
5 Optional Part Installation
3.9 Installing the Air Duct
Cover.
Rails.
Server.
FusionServer
163

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents