Huawei 2288H V5 User Manual page 156

Table of Contents

Advertisement

2288H V5 Server
User Guide
Figure 5-39 Installing a TFM
Step 14 Tighten the screws on the TFM. See (3) in
Step 15 Install the RAID controller card. For details, see
Step 16 Install the riser card tray above the RAID controller card. For details, see
Riser Card
Step 17 Install the chassis cover. For details, see
Step 18 Install the server. For details, see
Step 19 Connect the power cables. For details, see
Step 20 Power on the server. For details, see
Step 21 Log in to the iBMC WebUI, and check whether the new component is normal. For details, see
the
----End
Issue 04 (2018-09-04)
Tray.
Huawei Rack Server iBMC User
Copyright © Huawei Technologies Co., Ltd.
Figure
5-39.
5.8 Screw-in RAID Controller
3.5 Installing the Chassis
4.4 Installing the Server on Guide
5.4
PSU.
3.1 Powering On the
Guide.
5 Optional Part Installation
Card.
3.13 Installing a
Cover.
Rails.
Server.
147

Advertisement

Table of Contents
loading

This manual is also suitable for:

V100r005

Table of Contents