Wiring And Configuration; Wiring And Configuration For New Installs - GE Mark VIeS System Manual

Functional safety systems for general market
Hide thumbs Also See for Mark VIeS:
Table of Contents

Advertisement

7.3.3 Wiring and Configuration

For available modes and wiring and configuration instructions for new installations, refer to the table in the section Wiring
and Configuration for New Installs.
For wiring and configuration instructions for retrofit installations related to the existing terminal board being replaced by the
SUAA, refer to the following sections:
Wiring and Configuration for STAI/SHRA Retrofits
Wiring and Configuration for STAO Retrofits
Wiring and Configuration for STTC Retrofits
Wiring and Configuration for SRTD Retrofits
Wiring and Configuration for 24 V STCI Retrofits

7.3.3.1 Wiring and Configuration for New Installs

The following table provides a complete list of available Analog modes with links to the appropriate wiring and configuration
instructions.
Mode
CurrentInput
(with HART option)
VoltageInput
CurrentOutput
(with HART option)
RTD
Thermocouple
DigitalInput
Refer the section
SUAA Universal Analog Terminal Board
board screw definitions.
YUAA Universal I/O Modules
Field Device
4–20 mA Input
Internally and externally
powered
± 5 V or ± 10 V input
internally and externally
powered
0–20 mA Output
RTD types
TC types
Local or Remote CJs
External switches
for more information, including a diagram and complete terminal
Public Information
Wiring Diagrams
ToolboxST Configuration
Analog Inputs
Current Outputs
RTD Inputs
Thermocouple Inputs
Digital Inputs
Current Inputs
Voltage Inputs
Current Outputs
RTDs
Thermocouples
Digital Inputs
GEH-6855_Vol_II System Guide 179

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents