6.1 Installing Cooling Devices

6.1.1 (Optional) Installing the Fresh Air Integrated Unit

Prerequisites
Four installation positions are reserved of the pre-fab. Module. You need to install three of
them in sequence based on the site requirements.
Procedure
Step 1 Open the front panel of the smart cooling product, remove the two M8 nuts from the
compressor base, remove the two compressor fasteners, and tighten the two M8 bolts again, as
shown in the following figure.
Figure 6-1 Removing the compressor fixing plates
Step 2 Take off the cable connection box cover, supply air vent cover, and return air vent cover from
the pre-fab. module.
Issue 02 (2020-01-15)
Installing Devices Inside the Pre-fab.
Copyright © Huawei Technologies Co., Ltd.

6 Installing Devices Inside the Pre-fab. Module

Module
40

Advertisement

Table of Contents
loading

Table of Contents