Huawei FusionModule1000A20 Installation Manual page 49

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
5.
Step 3 Install two bolts on the outdoor side wall to hang the device.
Issue 02 (2020-01-15)
Figure 6-6 Cuting the glue
Remove the air intake and air exhaust vent covers.
Figure 6-7 Removing the connection box cover
Copyright © Huawei Technologies Co., Ltd.
6 Installing Devices Inside the Pre-fab. Module
43

Advertisement

Table of Contents
loading

Table of Contents