Figure 4-10 Securing pre-fab. module bases
Step 7 Level all bases.
1.
2.
3.
Issue 02 (2020-01-15)
Measure the height of each base using the level gauge, and record the height on its upper
surface using the marker.
Identify the base with the highest upper surface, and use it as the adjustment reference.
Select spacers based on the height difference between a base and the reference base, and
add spacers to adjust the height. Ensure that the height difference is within 5 mm after
adjustment.