FusionModule1000A40 Prefabricated All-in-One Data Center V200R003C10 Installation Guide Issue Date 2020-06-09 HUAWEI TECHNOLOGIES CO., LTD.
Page 2
Notice The purchased products, services and features are stipulated by the contract made between Huawei and the customer. All or part of the products, services and features described in this document may not be within the purchase scope or the usage scope. Unless otherwise specified in the contract, all statements, information, and recommendations in this document are provided "AS IS"...
Purpose This document describes the site requirements for installing the FusionModule1000A prefabricated all-in-one data center (FusionModule1000A for short) as well as the methods and skills required for installing pre-fab. modules, pipes, and cables, providing installation guidance and technical support for onsite installation personnel and technical support engineers.
3.3 Checking the Installation Environment Check the site requirements one by one, and start installation only after all requirements are met. Huawei will not be liable for any consequences caused if the installation environment does not meet the requirements. Mark the security zone: Use red caution belts to delimit a security zone, clean up obstacles in that zone, and place construction signs and warning signs in eye-catching positions.
Page 78
Center Installation Guide 8 Installing Devices Inside Pre-fab. Modules If the battery is damaged or leaks, contact Huawei technical support to replace the battery. Step 3 Connect the battery cables to the reserved power cable terminals. Figure 8-24 Battery position Figure 8-25 Connecting battery cables ...
Step 2 Remove the protective foam from the battery and check whether the battery is intact or leaks. If the battery is damaged or leaks, contact Huawei technical support to replace the battery. Step 3 Connect the reserved battery cable.