Huawei FusionModule1000A20 Installation Manual page 36

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
Procedure
Step 1 Secure the ground lugs to the pre-fab. module ground points by tightening M12x30 stainless
steel bolt assemblies.
Figure 4-15 Installing a ground lug
Figure 4-16 Installing a ground cable
----End
Issue 02 (2020-01-15)
Before the installation, remove the tinfoil from the ground lugs.
In addition to using ground lugs, you can also connect ground cables to pre-fab. module ground points
using M12x30 stainless steel bolt assemblies, as shown in the following figure. Ground cables can be
routed through plastic-coated metal hoses for protection based on site requirements.