FusionModule1000A20 Prefabricated All-in-One Data
Center
Installation Guide
Due to space limitation, connect power cables after you place batteries on one layer. Place
batteries in the battery cabinet from bottom to top and from right to left.
2.
3.
4.
Issue 02 (2020-01-15)
Figure 6-14 Installing the battery
Install a battery copper bar.
Figure 6-15 Installing the battery copper bar
Install copper bars between other batteries in the same way.
Install the negative battery cable.
Copyright © Huawei Technologies Co., Ltd.
6 Installing Devices Inside the Pre-fab. Module