Figure 4-2 Hoisting a pre-fab. module
Step 2 Use four angle steel brackets to secure the pre-fab. module.
1.
Issue 02 (2020-01-15)
Align the two mounting holes in an angle steel bracket with the two holes on the pre-fab.
module, and mark the hole positions for mounting the angle steel bracket on the concrete
platforms using a marker.