Step 2 Remove the screws from the installation panel of the electricity meter, and open the panel of
the electricity meter.
Step 3 Switch off the power input circuit breaker of the electricity meter.
Step 4 Remove the terminal block from the PD510 electricity meter, and gently press the latch
outwards to remove the terminal block.
Step 5 Remove the faulty PD510 electricity meter, and install a new PD510 electricity meter, and
insert the latch.
Step 6 Install the removed terminal block, and ensure that the terminal block is connected properly.
Step 7 (Optional) Install the panel of the PD510 electricity meter.
Step 8 Switch on the upstream circuit breaker of the PD510 electricity meter.
Step 9 Configure the PD510 electricity meter by referring to the initial configuration table for the
PD510 electricity meter.
Step 10 Check that the new PD510 electricity meter is working properly.
----End
Follow-up Procedure
Dispose of the removed PD510 that is confirmed faulty.

5.1.2 Replacing the SPD in a PDC

Prerequisites
Do not replace an SPD during a thunderstorm.
Impact on the System
None
Preparations
Tools: Phillips screwdriver, flat-head screwdriver, electrical tester pen
Materials: spare SPD module
Document: PDC user manual
Skill requirement: electrician's work permit
Issue 04 (2018-01-05)
After power-on, press buttons on the PD510 panel, and check whether the LCD displays information.
An SPD is faulty.
A spare SPD module of the same model is available and functional.