Semi-annual maintenance of the fire extinguishing system involves system commissioning.
Before the maintenance, inform the related administrative departments that the fire
extinguishing system will be maintained and stop working.
Before maintaining the fire extinguishing system, remove the electric control head from
the container valve of the fire cylinder. This prevents the extinguishant release due to
misoperations, and prevents accidental damage.
After the maintenance, reconnect the electric control head to the container valve of the fire
cylinder, and inform the administrative departments that the fire extinguishing system has
become operational.
Table 3-20 Semi-annual maintenance checklist for the fire extinguishing system
Device
Fire
extinguishi
ng system
commission
ing
Heat
detector
Issue 04 (2018-01-05)
Operation
Check Standard
Commission the
Devices work
fire extinguishing
properly, and the
system by
management system
following the
displays related
instructions in the
alarms.
Fire
Extinguishing
System
Commissioning
(CE) section in the
commissioning
guide for the
solution in use.
1. If the
Heat the heat
detector using a
heating device.
2. If the
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Troubleshooting
Replace the fire extinguishing
system components (CE).
Replace the heat detector.
temperature is
below the alarm
threshold, the
heat detector
indicator is off.
temperature is
above the alarm
threshold, the
heat detector
indicator turns
on. The
extinguishant
control panel
reports a loop 1
FIRE RELAY,
and the buzzer
buzzes.