LUNA2000-(97KWH-1H1, 129KWH-2H1, 161KWH-
2H1, 200KWH-2H1) Smart String ESS
Quick Guide
Issue: 06
Part Number: 31500HTW
Date: 2023-11-09
HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.

Advertisement

loading

Summary of Contents for Huawei LUNA2000-97KWH-1H1

  • Page 1 LUNA2000-(97KWH-1H1, 129KWH-2H1, 161KWH- 2H1, 200KWH-2H1) Smart String ESS Quick Guide Issue: 06 Part Number: 31500HTW Date: 2023-11-09 HUAWEI DIGITAL POWER TECHNOLOGIES CO., LTD.
  • Page 2 If the paint is damaged due to collision during transportation or installation, use the RAL9003 outdoor paint to repair the damaged area. • For details about the binding positions of the delivered mounting brackets and screws, see the packing list. Copyright © Huawei Digital Power Technologies Co., Ltd. 2023. All rights reserved.
  • Page 3: Clearance Requirements

    Appearance Front View Side View Top View Foundation Forklift space Hoisting bracket position Anchor bracket The site foundation must be designed by professional technical personnel such as those from a design institute. The technical personnel can refer to the foundation drawings of the Company.
  • Page 4 Front Front Front Front Front Installing the ESS This document uses the 200 kWh model as an example. The actual structure of a model may vary. 1. Remove the baffle plate from the bottom of the ESS.
  • Page 5 2. Remove the pallets. 3. Install the baffle plate to the bottom of the ESS.
  • Page 6 4. Open the cabinet doors.
  • Page 7 5. Take out the delivered documents, such as the packing list. Document position 6. Take out the mounting brackets delivered with the product. After opening the doors, check the number of deliverables based on the packing list. If any deliverable is missing, contact your dealer immediately. Anchor bracket, anchor bracket screw, and Leveling Hoisting bracket and screw...
  • Page 8 Using a Crane Crane hoisting capacity ≥ 2 t, working radius ≥ 2 m Using a Forklift...
  • Page 9 8. Secure the ESS. If the ESS is not positioned stably, use a spacer to level the ESS before securing it. Connecting a Ground Cable for the ESS Conductor Cross- Outer Name Type Terminal Source Sectional Area Diameter Single-core outdoor Prepared Ground copper/copper-clad...
  • Page 10: Installing Components

    Open the ESS cabinet doors and connect the ground cable. Installing Components Installation Positions Before installing components, ensure that the ESS is securely installed. Battery pack Smart Rack controller Rack mounted fire extinguishing system Smart Power Sensor Maintenance socket...
  • Page 11 Company the Company (DDSU666-H) Note [1]: Six dummy battery packs are preinstalled in the LUNA2000-97KWH-1H1 ESS, in which six battery packs are required. Four dummy battery packs are preinstalled in the LUNA2000-129KWH-2H1 ESS, in which eight battery packs are required.
  • Page 12 Install the rack mounted fire extinguishing system.
  • Page 13: Installing Battery Packs

    Installing Battery Packs • Before installation, ensure that battery packs are stored indoors and that other storage requirements specified in the user manual are met. • Before installation, check the status of the battery packs. Do not use the battery packs if the packing cases are exposed to rain, damaged, or deformed, or if the battery packs leak or fall.
  • Page 14 2. Use a forklift to transport the battery installation tray kit (installation kit for short) to the vicinity of the ESS. The installation kit should be purchased from the Company. Forklift space 3. Take out the installation kit. 4. Insert, assemble, and secure the installation kit onto the forklift. •...
  • Page 15 5. Take out the battery pack. • At least four persons are required to move a battery pack. • When using the lifting handles, hold the handle end closer to the device.
  • Page 16 • Secure the lifting handles (with the steel washers of the lifting handles closely fitted to the battery pack). If the stud of a lifting handle is bent, replace the lifting handle in time. • 6. Install and secure the battery pack on the installation kit.
  • Page 17 7. Install the battery pack in the ESS. 8. Secure the battery pack using the delivered screws. Dummy battery packs have been preinstalled in the 97 kWh, 129 kWh, and 161 kWh ESSs to separate air channels and must not be removed. 9.
  • Page 18 Top air channel plate Air channel plate between battery packs Bottom air channel plate 10.Install the column to the ESS.
  • Page 19 Installing the Rack Controller 1. Remove the decorative cover and maintenance compartment cover from the rack controller using the delivered security Torx wrench. 2. Install short-circuiting copper bars that are delivered with the product. • Secure the copper bars using a 16 mm socket. •...
  • Page 20 97 kWh/129 kWh/161 kWh Model 3. Install the decorative cover and maintenance compartment cover to the rack controller.
  • Page 21 4. Remove cables bound on the outside of the ESS. 5. Install the upper bracket, lower bracket, rainproof canopy, and lifting handles to the rack controller. • The upper bracket, lower bracket, rainproof canopy, and lifting handles are delivered with the product. •...
  • Page 22 6. Install the rack controller to the mounting bracket on the ESS. • The M8 screws are used to secure the rack controller. Keep them properly after removing them. • At least three persons are required to install the rack controller.
  • Page 23 Installing the Smart PCS 1. Install the mounting bracket. 2. Install mounting ears and lifting handles, and then secure the Smart PCS. The mounting ears are delivered with the Smart PCS, and the lifting handles are delivered with the ESS. •...
  • Page 24: Installing Cables

    (Optional) Installing the Maintenance Socket The 220 V socket is prepared by the customer. The actual socket appearance may vary. This guide describes only the installation method. 1. Remove the baffle plate in front of the power distribution area. 2. Install the maintenance socket. (Optional) Installing the Smart Power Sensor (DDSU666-H) 1.
  • Page 25 The cable diameter must comply with local cable standards. The key factors include the rated current, cable type, routing method, maximum expected line loss, rated temperature, ambient temperature, thermal resistance, acidity, sedimentation, and environmental protection requirements. Conductor Cross- Outer Name Type Terminal Source...
  • Page 26 Installing Cables for the Rack Mounted Fire Extinguishing System Take out the reserved cables and install them to the rack mounted fire extinguishing system. Ensure that the cables are correctly installed. If a fire occurs when cables are not connected or incorrectly connected, the ESS cannot actively extinguish the fire.
  • Page 27 Installing Battery Pack Cables 1. Install copper bars for battery packs, and connect the battery rack general output power cable and black start cable. • One ends of the battery rack general output power cable and black start cable are preinstalled before delivery.
  • Page 28 200 kWh Model Black start • No copper bar is required for the preinstalled dummy battery packs of 97 kWh, 129 kWh, and 161 kWh models. • Keep the redundant copper bars of the 97 kWh, 129 kWh, and 161 kWh models properly for later use.
  • Page 29 161 kWh Model Connect the black start cable to Pack1.
  • Page 30 129 kWh Model Connect the black start cable to Pack2.
  • Page 31 97 kWh Model Connect the black start cable to Pack3.
  • Page 32 2. Install the 48 V cables. • The 48 V cables of all models are connected in the same way. • Cables to 2FCB6 and 2FCB7 are preinstalled before delivery. • Other 48 V cables are delivered with the product. •...
  • Page 33 3. Install cables to the COM ports. • The COM cables of all models are connected in the same way. 4. Close the terminal covers of • Cables to COM-1 on Pack1 and COM-2 on Pack12 are the battery packs. reserved before delivery.
  • Page 34 Installing Rack Controller Cables 1. Remove the decorative cover and maintenance compartment cover from the rack controller using the delivered security Torx wrench. 2. Connect the preinstalled cables to the BAT/BUS ports. Magnetic rings are delivered with the product and need to be bound after being installed. •...
  • Page 35 97 kWh/129 kWh/161 kWh Model Cable Label (Left) Wiring Terminal Cable Label (Right) Wiring Terminal 107-1F1:2>TA1:2BAT+ 2BAT+ 108-1Q2:1>TA1:1BUS+ 1BUS+ 110-1F2:2>TA1:1BAT+ 1BAT+ 111-1Q2:3>TA1:1BUS- 1BUS- 109-1Q1:4>TA1:2BAT- 2BAT- 3. Connect the preinstalled cables to J1 (left), J2 (right), and FE1.
  • Page 36 • When securing the network cable (as shown by ⑥ in the figure), hold the cable and align it with the FE network port. After the network cable is properly installed, do not release it. Use the other hand to tighten the nut of the RJ45 connector. •...
  • Page 37 Installing DC Power Cables • The prefabricated DC power cables are delivered with the product. The terminals at two ends of a DC power cable are applicable to M10 and M12 screws respectively. Connect the M10 terminal to the DC circuit breaker 1Q2 in the cabinet, and connect the M12 terminal to the DC side of the Smart PCS.
  • Page 38 Installing an Auxiliary AC Power Cable Obtain the AC auxiliary power from the mains or a reliable power supply. Do not directly obtain power from the AC side of renewable energy inverters such as PV inverters and wind power converters. Installing AC Input Power Cables for the UPS Obtain the AC auxiliary power from the mains or a reliable power supply.
  • Page 39 Installing Communications Cables Installing an FE Communications Cable Connect the FE communications cable to the WAN port on the CMU. The communications cable needs to be routed through the magnetic ring at the cable hole at the bottom. (1) White- (2) Orange and-orange (3) White-...
  • Page 40 Installing Fiber Ring Network Communications Cables • Only professionals are allowed to connect and splice optical fiber cables. • In the optical fiber ring topology, two optical fiber cables are required. 1. Remove the external mechanical parts from the access terminal box (ATB). 2.
  • Page 41 5. Connect the peripheral optical fiber cable to the ATB, splice the optical fiber cable and the optical jumper, and then wind the spliced cable around the fiber spool on the ATB. 6. Check that the cables are connected correctly and securely.
  • Page 42 Name DDSU666-H Side ESS Side K1-COM1:+>1PGH1:485A (preinstalled before 485A delivery) RS485 communications cable K1-COM1:->1PGH1:485B (preinstalled before 485B delivery) Current transformer CT:5 I* (white) XT1:1:2>1FCB:1 cable CT:6 I (blue) XT1:3:1>1PGH1:L Power cable XT2:3:1>1PGH1:N 6.10 (Optional) Installing Maintenance Socket Cables The actual appearance of the maintenance socket may vary. The figure shows only the installation method.
  • Page 43: Check Before Power-On

    Check Before Power-On No. Check Item Expected Result • The equipment is intact and free from rust or paint flake-off. If the Equipment paint flakes off, repair the damaged paint. • appearance The labels on the equipment are clear. Damaged labels must be replaced.
  • Page 44 Powering On the ESS If the ESS has not been used for six months or longer after being installed, it must be checked and tested by professionals before operation. 1. Turn on the DC circuit breaker 1Q1 (as shown by 7 in the figure). 2.
  • Page 45 Commissioning (SmartLogger WebUI) • The operating system of Windows 7 or later is supported. • The web software version corresponding to the WebUI screenshots in this guide is SmartLogger V300R023C00SPC153. The screenshots are for reference only. • For details about deployment commissioning in energy storage scenarios, see the Commercial and Industrial Microgrid Energy Storage Solution Quick Guide Preparations and WebUI Login 1.
  • Page 46 XX.XX.XX.XX 4. Enter https:// (IP address of the SmartLogger) in the address box of your browser. If you log in to the WebUI for the first time, a security risk warning is displayed. Click Continue to this website. 5. Log in to the WebUI. Scenario 1: Initial Login When the User Name Is Displayed as Admin In this scenario, you need to update the SmartLogger to V300R023C00SPC120 or later.
  • Page 47 Checking the SmartLogger Software Version Choose Monitoring > Logger(Local) > About and check that the software version is the same as the latest version in FusionSolar Software Download (https://support.huawei.com/enterprise/en/fusionsolar/smartlogger-pid-21294677/software). Upgrading the SmartLogger • If the SmartLogger software version is not the latest version in FusionSolar Software Download, upgrade the SmartLogger.
  • Page 48 3. Choose Monitoring > ESR > Running Param. > Setting and set Quantity of battery packs to the actual quantity of installed battery packs. Quantity of Battery Packs LUNA2000-97KWH-1H1 LUNA2000-129KWH-2H1 LUNA2000-161KWH-2H1 LUNA2000-200KWH-2H1 Choose Monitoring > ESM > About and check all ESM software versions.
  • Page 49: System Start-Up

    Choose Maintenance > Software Upgrade, upload the upgrade package, select the CMU, CMU_BSP, and ESU, and upgrade the software. 6. Choose Monitoring > ESM and check in the upper right corner to ensure that no major alarm is generated. System Startup Start up the system when needed.
  • Page 50 Parameter Description If this parameter is set, the capacity of the grid-connection point is not limited. No control The inverter and Smart PCS run according to the preset control policy. Active If this parameter is set, the active power of the grid-connection point for capacity limit purchasing or feeding power cannot exceed the preset capacity limit.
  • Page 51 Statement How Do I Connect the ESS to the FusionSolar Smart PV 11.1 Management System? 1. Enter https://management system IP address: 31943 in the address box of a browser, and press Enter. The login page is displayed. 2. Enter the username or email address and password, and click Log In. 11.2 How Do I Create a Plant? 1.