Charging Extinguishant - Huawei FusionModule 1000A40 Maintenance Manual

Hide thumbs Also See for FusionModule 1000A40:
Table of Contents

Advertisement

FusionModule1000A40 IT Solution
Maintenance Guide (2016.05, AI Version)
4.
----End
Follow-up Procedure
Dispose of the removed fire cylinder that is confirmed faulty.

5.4.9 Charging Extinguishant

Prerequisites
Preparations
Tools: platform scale, hose with a pressure tolerance greater than 2.5 MPa, gate valve,
camshaft device, pipe wrench, adjustable wrench
Materials: extinguishant charging cylinder with sufficient extinguishant, nitrogen cylinder
with sufficient nitrogen
Documents: fire extinguishing device installation position diagram (standard)
Skill requirement: fire engineer
Issue 04 (2018-01-05)
Figure 5-55 Removing the safety pin
Reinstall and tighten all screws.
The fire cylinder has passed the air-tightness test.
Tools and materials are ready.
All tools and materials except the camshaft device are provided by the charging station.
Extinguishant needs to be charged in the charging station.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
5 Components Replacement
127

Advertisement

Table of Contents
loading

Table of Contents