Mount The Modules - Cisco Room Kit EQX Installation Manual

Hide thumbs Also See for Room Kit EQX:
Table of Contents

Advertisement

2. Mount the modules

The main mounting structure is composed of three modules
hanging on the wall mount beam; one center module and two
identical side modules.
Mounting modules
2x
side module
2x
angle bracket
(Box: C1, C2)
(Box: A)
4x
sliding nut
(Box: A)
1x
center module
8x
(Box: B)
(M6x8, Hex 4 mm)
(Box: B)
You also need two screws for fastening the angle
bracket to the wall (not provided by Cisco).
D15514.01 | 2023 OCTOBER | Cisco Room Kit EQX Installation Guide
2.1. Slide nuts in the wall mount beam
Slide 4 nuts into the notch on the beam. Place the nuts below
the keyholes.
The nuts are required when fastening the modules to the
beam in
step
2.4.
9
×4
4x
Copyright © 2023 Cisco Systems, Inc. All rights reserved.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Room series

Table of Contents