Cisco Room Kit EQX Installation Manual page 51

Hide thumbs Also See for Room Kit EQX:
Table of Contents

Advertisement

20.3. Adjust the VESA rail position
1. Check that the interface arm is in its neutral position.
2. Measure the distance
A
to the top of the screen.
A
D15514.01 | 2023 OCTOBER | Cisco Room Kit EQX Installation Guide
3. Hold the VESA rail, while you unscrew the four screws
that holds the rail in place.
4. Move the rail up or down to match the distance
close as possible.
5. Insert the screws again and tighten to hold the rail firmly
in its new position.
Two screws on
each side holding
the rail in place.
51
A
as
close to A
Copyright © 2023 Cisco Systems, Inc. All rights reserved.
Measure from the
T-mark on the grille
to the top of the rail.
Two screws on
each side holding
the rail in place.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Room series

Table of Contents