Cisco Room Kit EQX Installation Manual page 55

Hide thumbs Also See for Room Kit EQX:
Table of Contents

Advertisement

21.2. Hang the screen on the VESA rail
1. Push both interface arms firmly, to put them in pop-out
mode.
They pop out quickly, so mind your fingers!
Push to
pop out
Interface arms in pop-out mode
D15514.01 | 2023 OCTOBER | Cisco Room Kit EQX Installation Guide
2. Hang the screen with interface arms onto the rail a distance B, 50-70 mm (2-3 in.), away from
the left screen. Make sure it hooks into the groove as shown in the close-up.
B
55
The interface arms
hooks into the groove
on top of the rail.
Copyright © 2023 Cisco Systems, Inc. All rights reserved.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Room series

Table of Contents