Commissioning Guide
Documents: documents delivered with the TP481200B, power supply and
distribution device layout diagram, Initial Configuration Parameters for Power
Supply and Distribution Devices, TP482000B V300R002C03 Central Office Power
System User Manual (TP482000B-N20B1, TP482000B-N20B2, TP481200B-N20B1,
and TP481200B-N20B2)
Skill requirement: power distribution engineers
Procedure
Step 1 Measure the input voltage of the AC input circuit breaker. The value ranges from
85 V AC to 300 V AC.
Step 2 Switch on the AC input circuit breaker and measure the output voltage of the AC
input circuit breaker. The value ranges from 85 V AC to 300 V AC.
Step 3 Check that the RUN indicator on the rectifier is steady on.
Step 4 Measure the voltage between the –48 V busbar and the RTN+ busbar. The value
ranges from –42 V DC to –58 V DC.
Step 5 Power on the TP481200B, and view and complete its initial configuration.
● During the TP481200B commissioning process, modify the initial configuration
parameters by referring to the
Supply and Distribution Devices .
● If any alarm is raised, rectify the fault before continuing the commissioning.
Step 6 Set the number N of batteries connected, the rated capacity, and installation time
based on site requirements.
Issue 03 (2022-12-15)
NO TE
For the diagram and table, see the initial configuration parameter manual for the solution
in use.
NO TICE
NO TE
Set the voltage test mode if the cable for monitoring single battery voltage is configured.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Initial Configuration Parameters for Power
66

Advertisement

Table of Contents
loading

Table of Contents