Commissioning Guide
● The method of adding a camera using automatic discovery applies to all other management
domains except Subnet and Root.
● After a camera is added, it will be displayed under the corresponding management domain
on the Data Center Planning page. On the Data Center Planning page, you can set
parameters such as the Name for the camera.
----End
Follow-up Procedure
Table 9-16
Camera page.
Table 9-16 Follow-up procedure
If You Want To...
Query the information about a camera
Refresh the camera list

9.4 Commissioning Fire Extinguishing Devices

9.4.1 Commissioning Fire Extinguishing Devices (CE)

9.4.1.1 Commissioning the Extinguishant Control Panel (CE)

Context
Initial configuration parameters have been set for the extinguishant control panel
before delivery and do not need to be set onsite.
Preparations
Tools: none
Documents: power supply and distribution system diagram, documents delivered
with the extinguishant control panel, fire extinguishing system conceptual diagram
(CE), fire extinguishing device layout diagram (CE)
Issue 03 (2022-12-15)
NO TE
describes the operations that can be performed on the Discovery
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Then...
1. On the Discovery Camera page,
specify one or multiple of the
keywords Code, Name, and IP
Address.
2. Click Search.
To reset the search criteria, click
Reset.
On the Discovery Camera page, click
Refresh. The camera information in
the list is refreshed.