Verify that the configurations of various systems in the FusionModule1000 are
consistent with the initial configuration tables.
This manual describes how to perform power-on commissioning. For details
about drawings and initial configuration parameters required during the
operation, see the initial configuration parameter manual for the solution in
use.
Conduct power-on commissioning only after the FusionModule1000 is
installed and the installation is verified.
Power-on commissioning for each specific system must be performed under
instructions from qualified engineers.
The initial configuration parameters are essential to the reliable running of all
systems. Improper modifications of parameters may cause abnormal running
status, or even damage to the systems.
The initial parameters of the FusionModule1000 are configured before
delivery. For details about how to modify the parameters, see the documents
delivered with the devices and the actual solution configuration.
Prior to the power-on commissioning, remove all the protective devices
installed for transporting the FusionModule1000, such as the smart cooling
product protection pad and the securing tape on the smoke detectors and
heat detectors.
Before power-on commissioning, verify that the aisle temperature is within
the normal working range.
Do not perform power-on commissioning during a thunderstorm.
Verify that the upstream power supply is continuous during power-on
commissioning.
Operations marked as optional in chapters, sections, or procedures can be
performed depending on the actual situation.
Huawei assumes no liability for any loss caused by unauthorized changes to
the initial configuration parameters.
Copyright © Huawei Digital Power Technologies Co., Ltd.

2 Precautions for Power-On Commissioning

Precautions for Power-On
Commissioning
23

Advertisement

Table of Contents
loading

Table of Contents