Issue 03 (2022-12-15)
Figure 9-12 Deleting one module
b.
In the displayed Confirm dialog box, click OK.
Delete multiple modules in batches.
a.
Click
on the toolbar. The batch deletion page is displayed.
Figure 9-13 Deleting multiple modules in batches page
b.
Select multiples modules and click Delete.
c.
In the displayed Confirm dialog box, click OK.