Huawei FusionModule1000A20 Commissioning Manual page 69

Prefabricated all-in-one data center
Hide thumbs Also See for FusionModule1000A20:
Table of Contents

Advertisement

FusionModule1000A20 Prefabricated All-in-One
Data Center
Commissioning Guide
Table 9-3 Setting battery parameters
Main
Men
u
Para
mete
rs
Setti
ngs
Step 7 Switch the AC input circuit breaker to OFF.
Step 8 Switch the battery circuit breakers to ON.
Step 9 Switch the AC input circuit breaker to ON.
Step 10 Switch all the circuit breakers to the appropriate status based on site
requirements.
Step 11 Observe the power system for 15 minutes. If no alarm is generated on the LCD
during this period, the current and voltage for batteries and loads are normal.
Issue 03 (2022-12-15)
Secon
Third-
d-
Level
Level
Menu
Menu
Batter
Basic
y
Parame
ters
Other
Parame
ters
NO TE
● If battery routes 1 and 2 are respectively connected to a battery string (each battery
string consists of four 12 V, 150 Ah batteries in series), set Battery1 Connected and
Battery2 Connected to Yes and others to No, and set Rated Capacity to 150 Ah.
● If battery route 1 is connected to two battery strings in parallel (each battery string
consists of four 12 V, 150 Ah batteries in series), set Battery1 Connected to Yes and
others to No, and set Rated Capacity to 300 Ah.
Copyright © Huawei Digital Power Technologies Co., Ltd.
9 Commissioning Core Components
Fourth
Default
Setting
- Level
Value
Menu
Battery
Yes
Yes/No
n
connec
ted
Rated
150Ah
Rated
capacit
capacity
y
of each
battery
string
BLVD
No
Yes/No
Enable
Installa
-
Current
tion
time
Time
Remarks
If n battery strings
are connected, set
Battery1 Connected
to Battery N
Connected to Yes,
and set the other
parameters to No.
The batteries
controlled by one
circuit breaker or
fuse are called a
battery string.
-
-
62