Section 10
Unbalance protection
P
is number of parallel units in the affected section = 9.
a
The per unit phase-to-neutral capacitance of the parallel group of capacitor units that include
blown fuses is calculated as,
=
C
s
C
g
IECEQUATION19347 V1 EN-US
Where, S
The per unit capacitance of the phase (both WYEs) that includes blown fuses is calculated as,
(
P C
=
a
C
p
IECEQUATION19348 V1 EN-US
Where,
P
is the number of parallel units in a group = 9.
u
For a single WYE bank, P
Because of the element failure in the left section, per unit (line-to-ground voltage) unbalance
voltage in the neutral is calculated as,
=
V
NG
2
IECEQUATION19349 V1 EN-US
Internally fused capacitor units are subjected to the over-voltage across elements and fuses
within the unit as internal fuses blow and remove elements from the parallel group. The over-
voltage on the remaining elements and fuses are considered in addition to the over voltage on
units without the blown fuses. Therefore, the line-to-neutral voltage across the phase that
includes blown fuses is calculated as,
= +
V
1
LN
IECEQUATION19350 V1 EN-US
In an internally fused capacitor bank, the unbalance detection indicates the total number of
failed capacitor elements within a capacitor unit.
The trip level should be set so that:
The number of operated fuses in the affected capacitor unit does not exceed the
maximum number recommended by the manufacturer.
The voltage on the healthy capacitors does not exceed the contingency over-voltage
capability of the capacitor units (usually, 110% of the rated voltage). Note that the
element voltage in the unit with blown fuses may exceed 110% of the normal voltage.
Then, the per unit voltage on the capacitor units in the affected series group with blown fuses
is calculated as,
V
=
V
CU
IECEQUATION19351 V1 EN-US
If C
= 0 p.u., then
g
=
V
V
CU
IECEQUATION19352 V1 EN-US
272
´
S
C
u
g
(
)
´
-
+
S
1
1
u
number of series group of units in a phase = 1.
u
) (
)
´
+
-
P
P
s
u
a
P
u
= P
and C
a
u
3
-
1
+
C
p
V
NG
´
C
LN
s
C
g
´
S
LN
u
© Copyright 2017 Hitachi Power Grids. All rights reserved
= C
.
p
s
1MRK 511 401-UEN Rev. K
(Equation 161)
(Equation 162)
(Equation 163)