ABB Relion 670 Series Applications Manual page 243

Bay control
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 511 401-UEN Rev. K
Parameters of SCB
Number of series group capacitor elements in a
unit (S
e
Capacitance value of an element (C
Phase CT ratio
Neutral CT ratio
Figure 112
7.31 MVAr
IEC19000199 V1 EN-US
Figure 112: Single line diagram for ungrounded double WYE capacitor bank
The configuration of capacitor unit (C
the
Figure
Bay control REC670
Application manual
)
shows the single line diagram for the ungrounded double WYE capacitor bank.
13.8 kV Bus
113.
© Copyright 2017 Hitachi Power Grids. All rights reserved
Value
6
)
24.95 μF
e
1000/1 A
75/1 A
Preprocessing
Function Block
SMAI1
SMAI1
GRP1Lx
GRP1Lx
G1AI3P
G1AI3P
SMAI2
GRP2L1
GRP2L1
G2AI3P
G2AI3P
) and capacitor element (C
u
Section 10
Unbalance protection
SCUCPTOC
SCUCPTOC
I3P
I3UNB
IED
IEC19000199-1-en.vsdx
) in the filter are shown in
e
237

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rec670

Table of Contents