Huawei E9000 Troubleshooting Manual page 62

Hide thumbs Also See for E9000:
Table of Contents

Advertisement

Huawei Servers
Troubleshooting
Indicator
Data transmission
status indicator for
the management
network port
Connection status
indicator for the
management
network port
Issue 20 (2020-09-25)
Status
Off
Blinking
yellow
Off
Steady
green
Copyright © Huawei Technologies Co., Ltd.
5 Diagnosing and Rectifying Faults
Meaning
The network port is
not connected.
Data is being
transmitted.
No data is being
transmitted.
The network port is
connected properly.
Diagnosis Procedure
1. Connect the port
to another switch,
optical fiber, and
optical module to
check whether the
original switch
and optical fiber
are normal and
whether the type
and speed of the
original optical
module are
correct.
2. Check whether
the ports on the
switch and NIC
are up.
3. Check whether
the NIC is
operating
properly.
N/A
1. Connect the port
to another switch
and network
cable to check
whether the
original switch
and network
cable are normal.
2. Check whether
the ports on the
switch and NIC
are up.
3. Check whether
the NIC is
operating
properly.
N/A
53

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents