Huawei E9000 Troubleshooting Manual page 5

Hide thumbs Also See for E9000:
Table of Contents

Advertisement

Huawei Servers
Troubleshooting
Issue
13
12
11
10
09
08
07
06
05
04
03
Issue 20 (2020-09-25)
Date
2019-01-08
2018-07-13
2018-05-18
2018-03-12
2017-12-14
2017-08-08
2017-07-20
2017-04-18
2016-10-27
2016-07-11
2016-05-10
Copyright © Huawei Technologies Co., Ltd.
Description
This is the thirteenth official release.
This is the twelfth official release.
This is the eleventh official release.
Added description about the FusionServer
G2500 heterogeneous server.
This issue is the tenth official release.
Added information about the
FusionServer Pro G5500 server.
This issue is the ninth official release.
Added description about the CX916
switch module of the E9000 server.
This issue is the eighth official release.
Modified
4.4.1.1 Connecting a PC to the
Ethernet Switching
This issue is the seventh official release.
Modified
4.4.2.1 Collection
This issue is the sixth official release.
Added description that faulty E9000
compute nodes cannot be reseated in
Checking Indicators to Locate
This issue is the fifth official release.
Added the quick recovery method for
E9000 switch modules in
Faults Based on
Symptoms.
This issue is the fourth official release.
● Modified
4.4.2.7 Using the Switch
Module CLI to Collect FC Switching
Plane Information
● Added the quick recovery method in
5.6 Handling Faults Based on
Symptoms.
This issue is the third official release.
● Deleted the "Using the Web Tools of a
Switch Module to Collect Information
About an FC Switching Plane (NX120/
NX220/MX210/MX220)" section.
● Modified
4.4.2.4 Using the V8 Switch
Module CLI to Collect Ethernet
Switching Plane
● Added
9 Other
Resources.
About This Document
Plane.
Method.
5.5
Faults.
5.6 Handling
(MX210/MX220).
Information.
iv

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents