3. After assembly (including drive belt installation),
check alignment of pulleys with a straight edge placed
along the outer face of the drive pulley (Fig. 62).
A. The outer faces of the drive and driven pulleys
(not the idler pulley) should be in--line within 0.030"
(0.76 mm).
B. If necessary to align pulleys, remove driven
pulley from brush shaft and add or remove flat wash-
er(s) until drive and driven pulleys are correctly
aligned (Fig. 72).
C. If driven pulley was removed from roller brush
shaft, apply antiseize lubricant to splines of pulley
bore and slide pulley onto shaft. Install and tighten
flange nut until pulley is seated onto shaft and then
torque flange nut from 27 to 33 ft- -lb (37 to 44 N- -m).
Use a ½ wrench on roller brush shaft flats to prevent
shaft from rotating when tightening nut.
IMPORTANT: The roller brush shaft must nor con-
tact the cutting unit side plate. Also, heavy brush
contact on the rear roller will cause premature
brush wear.
4. Check that brush is parallel to rear roller with 0.060"
(1.5 mm) clearance to light contact with rear roller. If con-
tact is incorrect, brush operation will be adversely affect-
ed.
5. Install cover (item 20).There should not be a set
screw installed in the bottom of the cover.
6. Lubricate grease fittings on brush housings until
grease purges past inboard seals. Wipe excess grease
from seals and fittings.
DPA Cutting Units
1. Flange nut
2. Driven pulley
Page 9 - - 50
27 to 33 ft- -lb
(37 to 44 N- -m)
4
3
Antiseize
Lubricant
2
Figure 72
3. Flat washer
4. Roller brush shaft