Huawei SmartLogger2000 User Manual page 23

Hide thumbs Also See for SmartLogger2000:
Table of Contents

Advertisement

SmartLogger2000-(10-C, 11-C)
User Manual
The general single-phase input power cable for the smart array controller needs to be
prepared by the customer. You are advised to use a two-core armor copper cable with an
operating voltage to the ground greater than or equal to 300 V and a cross-sectional area of
4 mm
The power cable from the miniature circuit breaker (MCB) to the station-service power
source needs to be prepared by the customer. You are advised to use a two-core armor
copper cable with an operating voltage to the ground greater than or equal to 300 V and a
cross-sectional area of 4 mm
The PLC three-phase input power cable for the smart array controller needs to be prepared
by the customer. You are advised to use a three-core armor copper cable with an operating
voltage greater than or equal to 1000 V and a cross-sectional area of 10 mm
wire. Connect this cable only in the PLC networking scenario.
The cable from the busbar to the knife fuse switch needs to be prepared by the customer.
You are advised to use a three-core, multi-strand armor cable with an operating voltage to
the ground greater than or equal to 1000 V and a cross-sectional area of 10 mm
core wire. Connect this cable only in the PLC networking scenario.
Figure 2-9 Fiber+RS485/PLC
Issue Draft A (2017-02-15)
2
for each core wire.
2
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
for each core wire.
2 Product Overview
2
for each core
2
for each
15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartlogger 2011-cSmartlogger2010-c

Table of Contents