Huawei SmartLogger2000 User Manual page 180

Hide thumbs Also See for SmartLogger2000:
Table of Contents

Advertisement

SmartLogger2000-(10-C, 11-C)
User Manual
Figure 8-10 Dry contact scheduling
If a slave SmartLogger is configured in the system, SUN2000s should be connected to the
slave SmartLogger instead of the master SmartLogger. Otherwise, SUN2000s that connect to
the master SmartLogger cannot execute the power grid scheduling command.
Issue Draft A (2017-02-15)
The slave SmartLogger and remote signal receiver Q are optional devices for connection.
If a slave SmartLogger is to be connected, you must add the slave SmartLogger over the WebUI of
the master SmartLogger.
The master SmartLogger connects to the slave SmartLogger over the Ethernet. The slave
SmartLogger functions as the network device for the master SmartLogger.
A slave SmartLogger transfers the commands sent by the master SmartLogger to devices connected
to the slave SmartLogger.
The remote signal receiver receives the scheduling commands sent by the power grid company,
converts them into dry contact signals, and then sends them to the master SmartLogger.
Remote signal receiver P receives the active power scheduling commands. Remote signal receiver Q
receives the reactive power scheduling commands.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
8 Power Grid Scheduling
172

Advertisement

Table of Contents
loading

This manual is also suitable for:

Smartlogger 2011-cSmartlogger2010-c

Table of Contents