Basic Post-Installation Checklist
Basic Post-Installation Checklist
The following table provides a basic post-installation checklist with the related CLI commands. Further
verification of the system configuration would depend on the specific topology and configuration of the
installation, but this list will verify that the basic installation is operational.
See the descriptions of the individual commands for samples of the command output. Relevant
information in the output is in bold.
To check this
Version
Optics
Port configuration
Operational status
Linecard status
Connection mode
Link mode
External bypass configuration
Cisco SCE8000 GBE Installation and Configuration Guide
B-2
Use this command
show version
show inventory
show interface
show system operational status
show interface linecard
show interface linecard
connection-mode
show interface linecard link mode
show interface linecard
external-bypass
Appendix B CLI Commands to Verify a Successful Installation
Comments
Check the following:
Firmware version
•
Application version
•
Management agent status
•
Management agent version
•
In the physical inventory of the SCE
platform, verify that the installed optics
are supported by the interfaces.
Run this command for each port to get a
listing of the status and configuration of
all ports.
Status should be operational.
This command will give you an
indication of problems such as a power
problem or external bypass not
configured properly.
It should not be shutdown or silent.
Make sure that both the connection
mode and the failure mode are
configured correctly.
When connection-mode is inline, link
mode should be configured to
forwarding.
Only if external bypass modules are
installed. Check the following:
Configuration should be activated
•
on failure.
•
The number of devices should
match the number of links.