Park Pin Switch - Over-Drive (010) Switch Replacement - Honda CR-V 1997 Service Manual

Table of Contents

Advertisement

Park Pin Switch - Over-Drive (010) Switch Replacement - '99 - 00 Models
SRS
components are
located
in this area.
Review
the
SRS
component
locations, precautions, and procedures in the SRS
section
(24)
before performing
repairs or service.
NOTE:
If replacement
of
the park pin
switch or
the 0 10
switch
is
required,
replace them
as
a
set.
1.
Remove
the instrument panel
lower cover (see
section
20).
2. Remove the upper and lower
steering column covers (see section
17).
3. Remove the flange nuts securing the
steering
column, then lower the steering column.
4. Disconnect
the shift
lock solenoid and the park pin switch - 0 10 switch
connectors.
5. Remove
the
harness clamp
bracket.
6. Remove
the bolts securing
th
e
shift 1ever
assembly,
then
remove the shift lever
assembly,
7. Remove the
screws
securing the
shift
lock solenoid, then remove the
shift
lock solenoid.
8. Cut the
%
switch
wires
(RED and
BLK), then remove the
connector
from
the shift
lever
control
bracket.
g, Remove the control
checker from the shift lever control
bracket,
10. Remove the park pin switch from the
control
checker.
11. Remove the
shift
lever knob from the
shift
lever, then remove the %
switch from the shift lever knob.
PARK PIN SWITCH -
010 SWITCH
CONNECTOR
SCREW
2.5 N·m (0.25 kgf'm
.
1.8Ibf.f'1
SHIFT
LEVER
CONTROL
BRACKET
HARNESS CLAMP
PARK PIN
SWITCH
CONTROL
CHECKER
SHIFT LEVER
010 SWITCH
HARNESS ClAMP BRACKET
9.3
Nom
(0.95
kgf·m
.
6.9Ibl·h)
SHIFT LEVER KNOB
6 -12
N'm
10.6 -
1.2
kgl·m
••
- 8.7 Ibl·hl
12. Route
the
new %
switch wires through the shift lever
knob,
shift lever,
and shift
lever control bracket, then
instal
l
the knob
on
the shift lever, and install the switch in the knob.
13. Install the new park pin switch on the
control
checker, then install the
control
checker on the shift lever
control
brack-
et.
14. Route the park pin switch harness through the cut out
of
the shift lever
control
bracket.
15. Install the
OlD
switch wire
terminals in the
connector
cavities securely.
The wire termina ls
can
be installed in
cavity
No.1
or
No.
2.
16.
Install the
connector
and the harness
clamp
on the bracket.
17. Install
the
shift lock solenoid by aligning the joint of the shift lock solenoid plunger with the tip of the
shift
lock exten-
sion, then
secure
the shift lock
solenoid
with the
screws.
18.
Install the shift
lever assembly in the reverse order of removal.
19. Adjust the clearance between the 0 10
switch
wires
and
the edge of the
shift
lever
control
bracket Isee
page
14-2701.
20. Check the shift lever operation and
shift
lock
operation.
14-151

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cr-v 1998Cr-v 1999Cr-v 2000

Table of Contents