Sony FVS-1000 System Maintenance Manual page 32

Multi resolution film scanner, multi resolution telecine, telecine processor, telecine hdtv/sdtv processing boards, telecine log data processor, telecine 16 mm film adaptor kit, telecine optical kit, telecine mounted slide kit, telecine film sound process
Hide thumbs Also See for FVS-1000 System:
Table of Contents

Advertisement

1-10. Installation Procedure
8. Installation of the control panel
(1) Pull out the hinges in the arrow direction.
(2) Tighten the left and right lock screws to fix the hinges.
Hinge
(3) Fix the rack angle to the control panel with the supplied four screws (PSW4 x 10).
(4) Place the control panel on the hinges and fix with the four screws (B5 x 10) provided. Move the
hinges in the arrow direction and attach them.
(5) Connect the connector and the pin jack at the rear side of the control panel, then fix the harnesses
with the harness band.
PSW4 x 10
PSW4 x 10
Rear side
Pin jack
Harness band
Connector
1-20
Lock screw
Hinge
B5 x 8
Rack angle
B5 x 8
Hinge
Lock screw
Control panel
B5 x 8
B5 x 8
Hinge
Rack angle
PSW4 x 10
PSW4 x 10
FVS-1000 MMP1

Advertisement

Table of Contents
loading

Table of Contents