7. Adjusting the pad roller clearance
(1) Rotate the pad roller shaft in the arrow direction using
the flatblade screwdriver. Then temporarily tighten the
setscrews with all pad rollers touching the roller
clearance adjustment tool (film).
Pad roller clearance
adjustment tool (Film)
Pad roller shafts
(2) Rotate the pad driving lever using the flatblade
screwdriver and set the unloading state.
(3) Remove the pad roller clearance adjustment tool
installed in step 4.
(4) Remove the pad assembly once, and tighten the
setscrews securing the pad roller shafts (four each on S
side and T side).
8. Checking the film running
(1) Install the pad assembly to the base plate.
(2) Turn on the power of the unit.
(3) Install the test film for running check to the S reel
table, and hook it to the T reel table along the running
path.
(4) Run the film in the PLAY mode, and check the film
does not dislocate from the sprocket gear.
If the film dislocates from the sprocket gear, remove
the pad assembly, and repeat from steps 4 through 7.
(5) Install the drive cover (3) removed in step (1) of 6.
FVS-1000 MMP1
Pad roller shafts
3-4. Replacement of Periodic Replacement Part
3-25