Mitsubishi Electric Got 1000 Training Manual page 50

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

Point
Settings including QCPU (Q mode) Stage No. and Slot No.
With a bus connection, the PLC CPU recognizes the GOT as a 16 I/O point
intelligent function module.
A free PLC CPU I/O slot is allocated to the GOT, but when the PLC CPU
connected is a QCPU, no free basic base/extended base I/O slot can be
allocated.
On communication settings, build one stage(16 points ×10 slot allotment) for
GOT connection, so that the GOT can be allocated to an I/O slot.
Remarks
• Refer to chapter 3 of the GT Designer2 Version2 Screen Design Manual for
details on Communication Settings.
• Controller settings can also be performed with the GOT Utility.
Refer to the GOT1000 Connection Manual for details on Utility Communication
Settings.
4 - 10

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents