Mitsubishi Electric Got 1000 Training Manual page 183

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

(From previous page)
9)
7)
Click the Get Latest button.
8)
As the confirmation that the drive information
was acquired appears, click Yes.
7)
9)
Click the Upload button.
10) When the Yes button is clicked, screen data is
uploaded.
When the upload is completed, confirm the data in
"My Document".
Appendix 29

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents