Operation Check 1 - Mitsubishi Electric Got 1000 Training Manual

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

5.6 Operation check 1

Display the download screen of the project (select the [Communication] → [To/From
GOT...] menu).
After checking [Delete all old data in Project folder] in the [Project Download → GOT]
tab, click the Download button to download all the data to the GOT.
Reset the PLC CPU using the RESET key switch, and then switch to RUN.
Check if each switch of the initial screen (No.1) functions properly here.
(1) Test 1
Perform the following tests in screen No. 1.
Test object
Item
Touch operation
Screen state
Result of
operation
Write device
(2) Test 2
Perform the following tests in screen No. 1.
Test object
Item
1
Touch operation *
Screen state
Result of
operation
Write device
Read device
1
*
The line will not start when the operating time exceeds the planned operating
time.
Planned operating time (numerical input)
Touch the numerical input area.
When a key window screen appears, enter the numeric value
(15), and then press Enter of the key window.
D10
Line start
switch
Touch
The lamp is on till
The switch is
the planned
pressed.
operating time.
M10: ON
—————
Y7A: ON
5 - 33
Operating time
Operation lamp
(numerical display)
—————
—————
Count up till the
planned operating
time.
—————
D20
—————