Mitsubishi Electric Got 1000 Training Manual page 125

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

(3) Test 3
Perform the following tests in screen No. 1.
Test object
Item
Touch operation
Screen state
Result of
Write device
operation
Read device
(4) Test 4
Perform the following tests in screen No. 1.
Test object
Item
1)
Touch operation
Screen state
Result of
Write device
operation
Read device
(5) Test 5
Perform the following tests in screen No. 2.
Test object
Item
1)
Operations in the training
machine
Screen state
Result of
operation
Write device
Read device
Line stop switch
It is touched while the
operation lamp is on.
The switch is pressed.
M10: OFF
—————
Touch
Switch to Base Screen No. 2.
2
D0
Power off the Q series training machine
(After confirming Test 5, power back ON the Q series
training machine.)
The following alarm message appears:
"402 Communication timeout. Confirm communication
pathway or modules."
5 - 53
Comment display
—————
Comment "Line stopped"
appears.
—————
Y7B: OFF
Alarm switch
—————
System Alarm
—————
—————

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents