Mitsubishi Electric Got 1000 Training Manual page 154

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

(3) Operation check
2)
3)
1)
Display Base screen No. 3.
2)
Check that the operating time indicates
7:59:50.
3)
Touch the Preparation switch, and then touch
the Operation/Stop switch to start counting
the operating time.
4)
When the operating time exceeds 8 hours,
check if the lamp turns ON.
4)
6 - 26

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents