Training Device List And Sequence Program - Mitsubishi Electric Got 1000 Training Manual

Graphic operation terminal
Hide thumbs Also See for Got 1000:
Table of Contents

Advertisement

6.2.3

Training device list and sequence program

Device
M31
M32
M33
M34
T30
(1) Training device list
Signal name
Preparation
Operation/Stop
Operating
8 hours have elapsed.
Timer
Point
To identify the device used for the project data being edited, the Device List
function of GT Designer2 will be useful.
Refer to section 5.12 of this manual for details.
(2) Training sequence program
GOT
Device
operation
W
D30
W
D31
R
D32
R
D33
D34
R
D100
D200
6 - 6
Signal name
1 sec
10 secs
1 min
10 mins
1 hour
Base screen switching
Window screen switching
R: Reading W: Writing
GOT
operation
R
R
R
R
R
W
W

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents