5.1. Safety

All installation work must be carried out by qualified personnel according to the site
and equipment requirements and in compliance with local regulations.

5.2. Overview of installation work

The drive is delivered in transport units that must be joined and fixed to the floor at the
installation site. The installation includes the following work:
"Preparing the installation site", page 68
"Aligning transport units", page 69
"Joining transport units", page 71
"Applying silicone", page 72
"Installing roof joints", page 72
"Installing roof-mounted cooling units", page 73 (option)
"Installing roof attachments on marine drives", page 78 (option)
"Joining water pipes", page 80
"Joining busbars", page 81
"Connecting the heating cable", page 83 (option)
"Connecting raw water pipes", page 84
"Fixing the drive to the floor", page 84

5.3. General notes on installation

NOTICE
Risk of component damage. Incorrect transport, assembly, and post installation actions can
damage the drive or transport units. Foreign objects, metallic dust, and dirt can cause an
energized drive to fail
→ DO NOT use a crane if the transport units are secured to the base frame; use heavy load
hydraulics rollers or air cushions. If you are unsure, contact ABB for instructions.
→ DO NOT damage or dislocate the EMC sealing strips when you join 2 transports units; The
strips are glued to the outer surfaces of the cabinet frames.
→ Close the doors and secure and fasten all covers of the drive when the work is complete
PRODUCT
ACS5000W gen. 2
DOCUMENT KIND
User manual
DOCUMENT ID.
3BHS799208 E01
MECHANICAL INSTALLATION
REV.
LANG.
PAGE
J
en
66/186

Advertisement

Table of Contents
loading

Table of Contents