Finalization - ABB ACS560 Hardware Manual

0.75 to 160 kw, 1.0 to 215 hp
Hide thumbs Also See for ACS560:
Table of Contents

Advertisement

98 Electrical installation
8. Connect the twisted shield to the grounding terminal (7b).
9. For R3, connect the conductors to the R+ and R- terminals (7c).
10. Tighten to the torque given below.
Frame size
R+, R-

Finalization

Finalization
11. Install the grounding shelf for the control cables (included with the mounting
11. Install the grounding shelf for the control cables (included with the mounting
screws in a plastic bag in the delivery) onto the grounding shelf for the power
cables.
12. Ground the motor cable shield at the motor end. For minimum radio frequency
screws in a plastic bag in the delivery) onto the grounding shelf for the power
cables.
interference, ground the motor cable shield 360 degrees at the lead-through of
the motor terminal box.
8
R3
N.m
2.5...4.5
7c
7b
7a
lbf.ft
1.8...3.3
Electrical installation

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents