Huawei AP8082DN Hardware Installation And Maintenance Manual page 104

Table of Contents

Advertisement

AP8082DN and AP8182DN
Hardware Installation and Maintenance Guide
Figure 6-87 Checking the reliability
The procedure for testing a crossover cable is the same as that for testing a straight-through
cable except for the sequence in which the indicators turn on, which depends on the wire
connections of a crossover cable.
The Ethernet cable is qualified if the indicators turn on in the following sequence:
At the master (left) section of the tester, the indicators turn on in the sequence of 1-8-G. At the
slave (right) section of the tester, the indicators turn on in the sequence of 3-6-1-4-5-2-7-8-G.
If the indicators do not come on in this sequence, the Ethernet cable is unqualified.
Figure 6-88 Testing the connection of an Ethernet cable
Issue 03 (2019-04-01)
NOTE
If a tester is not available, you can use a multimeter to perform a simple test, as shown in
Copyright © Huawei Technologies Co., Ltd.
6 Appendix
Figure
6-88.
97

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ap8182dn02351kqb02351kqc

Table of Contents