1. Install a new T1 Loading Arm Unit as reverse order of its removal.
For this installation the following adjustment is necessary.
(Adjustment Procedures)
1. Install T1 Loading Arm Unit so that the Hole (A) and Hole (B) are in
parallel.
2. After installation, confirm that the T1 post moves smoothly on the
Loading Rail. Then Linearity Adjustment is necessary.
5.7.21. Cleaner Solenoid Replacement and Adjustment
(Removal of Cleaner Solenoid)
1. Remove the top panel.
2. Remove the Front Loading Unit.
3. Remove the connector P11 on the Mechanical Interconnection
Board.
4. Remove two screws (A) and remove the Cleaner Solenoid Unit.
5. Remove two screws (B) and remove the Cleaner Solenoid.
(Installation of Cleaner Solenoid)
1. Install a new Cleaner Solenoid as reverse order of its installation.
2. After its installation adjust Cleaner Solenoid Position.
T1 Loading Arm Unit Position Adjustment
71